nvtanswers - How do I prepare to install the NVT Phybridge CLEER?
 
Reset Search
 

 

Article

How do I prepare to install the NVT Phybridge CLEER?

« Go Back

Information

 
Answer

The NVT Phybridge CLEER may be physically installed in the server room prior to use, ensuring that the switch will have adequate ventilation, next connect coax cables to the downlink ports and if required ensure that an earth grounding connection is also established. Before powering the CLEER, ensure all legacy digital equipment is disconnected from the infrastructure to be used to avoid any damage.

The Quick Install Guide can be found here.
The CLEER Admin Guide can be found here.
The IP PoE Calculator can be found here.

Feedback

 

Was this article helpful?


   

Feedback

Please tell us how we can make this article more useful.

Characters Remaining: 255